Improvement Projects by School

(click images to enlarge)

Program Overview
Holt Improvements Pie Chart.jpeg
Proposed Improvements at Holt Public School Buildings
Midway Early Learning Center

 Critical Infrastructure 

  • Improving HVAC 

  • systems, including adding air conditioning 

  • Replacing pavement, sidewalks, and curbs 

  • Replacing select roofing 

  • Improving interior and exterior lighting and controls 

  • Upgrading electrical distribution systems 

  • Upgrading Building Management Systems 

  • Upgrading plumbing to bring up to building code 

  • Replacing drinking fountains 

 Safety & Security 

  • Remodeling secure building entrance  

  • Replacing door hardware 

  • Improving site traffic safety and flow for pedestrian safety 

 

 Learning Environments 

  • Replacing classroom / office furniture and equipment 

  • Improving playground 

  • Upgrading flooring, ceilings, and cabinetry 

  • Upgrading instructional technology equipment 

 

 Innovation 

  • Modernize facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs

Holt_BondProposal2021_BuildingGraphicBoa
Dimondale Elementary School

 Critical Infrastructure 

  • Constructing new parking lots, drives, and walkways

 Safety & Security 

  • Constructing a new playground 

  • Improving site traffic safety and flow for pedestrian safety

 

 Learning Environments 

  • Constructing new TK-5 Elementary School, including new classroom furniture and equipment  

  • Upgrading instructional technology, student devices, and classroom audio visual equipment 

  • Transition to grades TK - 5 

 

 Innovation 

  • Creating facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs

Holt_BondProposal2021_BuildingGraphicBoa
Elliott Elementary School

 Critical Infrastructure 

  • Improving HVAC systems, including adding air conditioning  

  • Replacing pavement, sidewalks, and curbs  

  • Replacing select roofing and windows  

  • Improving interior and exterior lighting and controls

  • Upgrading electrical distribution  

  • Upgrading Building Management Systems 

 Safety & Security 

  • Remodeling secure building entrance  

  • Replacing door hardware  

  • Improving playground  

  • Improving site traffic safety and flow for pedestrian safety 

 

 Learning Environments 

  • Constructing classroom addition  

  • Replacing classroom, office, and media center furniture and equipment  

  • Upgrading select flooring, ceilings, and cabinetry  

  • Upgrading instructional technology and student devices  

  • Upgrading classroom audio visual equipment 

  • Transition to grades TK - 5 

 

 Innovation 

  • Modernize facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs

Holt_BondProposal2021_BuildingGraphicBoa
Horizon Elementary School

 Critical Infrastructure 

  • Improving HVAC systems, including adding air conditioning  

  • Replacing pavement, sidewalks, and curbs  

  • Improving interior and exterior lighting and controls

  • Upgrading electrical distribution  

  • Upgrading Building Management Systems 

 Safety & Security 

  • Remodeling secure building entrance  

  • Replacing selective door hardware  

  • Improving playground  

  • Improving site traffic safety and flow for pedestrian safety 

 

 Learning Environments 

  • Constructing gymnasium/ multi-purpose room addition  

  • Constructing classroom addition  

  • Replacing classroom, office, and media center furniture and equipment  

  • Upgrading flooring, ceilings, and cabinetry  

  • Upgrading instructional technology and student devices  

  • Upgrading classroom audio visual equipment 

  • Transition to grades TK - 5

 

 Innovation 

  • Modernize facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs

Holt_BondProposal2021_BuildingGraphicBoa
Sycamore Elementary School

 Critical Infrastructure 

  • Constructing new parking lots, drives, and walkways 

 Safety & Security 

  • Constructing a new playground 

  • Improving site traffic safety and flow for pedestrian safety 

 

 Learning Environments 

  • Constructing new TK-5 Elementary School, including new classroom furniture and equipment  

  • Upgrading instructional technology, student devices, and classroom audio visual equipment 

  • Transition to grades TK - 5

 

 Innovation 

  • Creating facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs

Holt_BondProposal2021_BuildingGraphicBoa
Wilcox Elementary School

 Critical Infrastructure 

  • Improving HVAC systems, including adding air conditioning  

  • Replacing pavement, sidewalks, and curbs  

  • Replacing select roofing, windows, and doors  

  • Improving interior and exterior lighting and controls 

  • Upgrading electrical distribution  

  • Upgrading Building Management Systems  

  • Upgrading plumbing to bring up to building code  

  • Replacing drinking fountains 

 Safety & Security 

  • Remodeling secure building entrance  

  • Replacing selective door hardware  

  • Improving playground  

  • Improving site traffic safety and flow for pedestrian safety 

 

 Learning Environments 

  • Constructing gymnasium/ multi-purpose room addition  

  • Constructing classroom addition  

  • Replacing classroom, office, and media center furniture and equipment  

  • Upgrading flooring, ceilings, and cabinetry  

  • Upgrading instructional technology and student devices  

  • Upgrading classroom audio visual equipment 

  • Transition to grades TK - 5

 

 Innovation 

  • Modernize facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs 

Holt_BondProposal2021_BuildingGraphicBoa
Hope Middle School

 Retire School Building 

  • For decades, Hope has served generations of Holt Public children. The time has come to retire the building as a school facility. While the building has undergone renovations and additions in the past, the core structure and systems of the building are well-past their expected lifecycles. Additionally, Holt Public Schools student enrollment has decreased and is projected to continue decreasing over the next five years. For those reasons, the District has planned to not invest in renovations or improvements to Hope Middle School as a part of this bond proposal and plans to remove Hope as a school building. 

  • Taking Hope Middle School off-line would happen after improvements have been made to the elementary schools, Washington Woods and the Junior High.

Holt_BondBoards_3.24.21_Hope.jpg
Washington Woods Middle School

 Critical Infrastructure 

  • Improving HVAC systems, including adding air conditioning 

  • Replacing pavement, sidewalks, and curbs 

  • Replacing select roofing 

  • Improving interior and exterior lighting and controls 

  • Upgrading electrical distribution  

  • Upgrading Building Management Systems 

  • Replacing drinking fountains

 Safety & Security 

  • Remodeling secure building entrance  

  • Remodeling cafeteria 

  • Replacing selective door hardware  

  • Improving playground  

  • Improving site traffic safety and flow for pedestrian safety 

 

 Learning Environments 

  • Constructing classroom addition  

  • Remodeling science labs, music, and art classrooms 

  • Replacing classroom, office, and media center furniture and equipment  

  • Upgrading flooring, ceilings, and cabinetry  

  • Upgrading instructional technology and student devices  

  • Upgrading classroom audio visual equipment 

  • Transition to grades 6 – 8  

 

 Innovation 

  • Constructing classroom addition  

  • Remodeling science labs, music, and art classrooms 

  • Replacing classroom, office, and media center furniture and equipment  

  • Upgrading flooring, ceilings, and cabinetry  

  • Upgrading instructional technology and student devices  

  • Upgrading classroom audio visual equipment 

  • Transition to grades 6 – 8 

Holt_BondProposal2021_BuildingGraphicBoa
Holt Junior High School

 Critical Infrastructure 

  • Improving HVAC systems, including adding air conditioning 

  • Replacing pavement, sidewalks, and curbs 

  • Replacing select roofing, windows, and doors 

  • Improving interior and exterior lighting and controls 

  • Upgrading electrical distribution  

  • Upgrading Building Management Systems 

  • Upgrading plumbing to bring up to building code 

  • Replacing drinking fountains 

 Safety & Security 

  • Remodeling secure building entrance  

  • Replacing selective door hardware  

  • Improving playground  

  • Improving athletic fields 

  • Improving site traffic safety and flow for pedestrian safety 

 

 Learning Environments 

  • Replacing classroom, office, and media center furniture and equipment  

  • Upgrading flooring, ceilings, and cabinetry  

  • Upgrading instructional technology and student devices  

  • Upgrading classroom audio visual equipment 

  • Transition to grades 6 – 8 Middle School 

 

 Innovation 

  • Modernize facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs 

Holt_BondProposal2021_BuildingGraphicBoa
Holt High School

 Critical Infrastructure 

  • Improving HVAC systems, including adding air conditioning 

  • Replacing pavement, sidewalks, and curbs 

  • Upgrading auditorium sound system and lighting 

  • Upgrading Building Management Systems 

  • Upgrading plumbing to bring up to building code 

  • Replacing drinking fountains 

 Safety & Security 

  • Remodeling secure building entrance  

  • Upgrading selective door hardware  

  • Improving site traffic safety and flow for pedestrian safety 

  • Replacing tennis courts, resurfacing track and improving athletic fields

 

 Learning Environments 

  • Constructing classroom additions 

  • Replacing musical instruments, classroom, office, and media center furniture, equipment, and flooring 

  • Upgrading instructional technology and student devices 

  • Transition to grades 9 –12

 

 Innovation 

  • Fostering student growth by maximizing learning and engagement by offering programming options that align with students’ post-secondary plans 

  • Dedicated spaces for relevant, meaningful, student-centered learning experiences like Robotics, Aviation, Early College, and Career Technical Education, and more 

  • Modernize facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs 

Holt_BondProposal2021_BuildingGraphicBoa
Holt HS North Campus

 Critical Infrastructure 

  • Improving HVAC systems, including adding air conditioning 

  • Replacing pavement, sidewalks, and curbs 

  • Replacing select roofing and doors 

  • Upgrading Building Management Systems 

  • Replacing drinking fountains

 Safety & Security 

  • Remodeling secure building entrance  

  • Replacing selective door hardware  

  • Improving site traffic safety and flow for pedestrian safety 

 

 Learning Environments 

  • Replacing classroom, office, and media center furniture and equipment  

  • Upgrading flooring, ceilings, and cabinetry  

  • Upgrading instructional technology and student devices  

  • Upgrading classroom audio visual equipment 

  • Transition to Innovation Center

 

 Innovation 

  • Fostering student growth by maximizing learning and engagement by offering programming options that align with students’ post-secondary plans 

  • Dedicated spaces for relevant, meaningful, student-centered learning experiences like Robotics, Aviation, Early College, and Career Technical Education, and more 

  • Modernize facilities to maximize educational opportunities, flexibility, and safety while considering environmental sustainability and future operating costs

Holt_BondProposal2021_BuildingGraphicBoa